top of page

Carrion Construction Photos

The Carrion Home was designed with 

special features for the family's specific special needs in mind. This home is being built with Class A fire-resistive exterior materials to mitigate damage from possible future forest fires. Total project time from design to the projection of the family moving in is approximately 12-13 months.

IMG_7179.JPG
IMG_7181.JPG
IMG_7180.JPG
IMG_7196.JPG
IMG_7199.JPG
IMG_7202.JPG
1E0F8589227D421696AA05C0F3BC1321.jpg
DA31806AC37E4630913973A9E2B5B4AE.jpg
FB97BFC35AC74F739AC75899EE21527B.jpg
954FF634ED9C44D29DE82D23740732ED.jpg
IMG_0240.JPG
IMG_0241.JPG
bottom of page