top of page

Warden Construction Photos

The Warden Home was designed for a multi-generational family. Their primary home has been in Detroit for decades. This home is being built with Class A fire-resistive exterior materials to mitigate damage from possible future forest fires. Total project time from design to the family moving in is approximately 14-15 months.

IMG_4914.JPG
First inspection.jpg
IMG_5074.JPG
File_004 - Copy.png
IMG_6597 - Copy.HEIC
IMG_6603 - Copy.HEIC
IMG_6634 - Copy.JPG
IMG_6694.JPG
IMG_6692.JPG
IMG_6933.JPG
IMG_6768.JPG
IMG_7511.JPG
File_000 (1).png
IMG_9418.JPG
bottom of page